Rochester, NY: Remediation of Dinaburg Site

Major Project Tasks:    

  • Excavated and dispose of TCE-impacted soils and backfilled
  • Install groundwater and multi-phase extraction wells
  • Construct, test, operate, and maintain MPE treatment system
  • Perform trenching and install piping system from groundwater and vapor extraction wells to MPE treatment system
  • Install HDPE liner over unpaved areas and placed gravel over liner
  • Perform air monitoring in accordance with Community Air Monitoring Program (CAMP) Construction of lined staging pads for excavation spoils generated onsite

Major Project Contaminants:

  • Trichloroethylene (TCE)
  • VOCs

Significant Project Obstacles:

  • Very small site in close proximity to residential neighborhood

Location: Rochester, NY

Owner: NYSDEC
Engineer: URS Corporation
Project total: $868,000