Major Project Tasks:    

  • Installation of 150' watertight barrier wall
  • Installation of steel electrodes for thermal remediation
  • Electrodes installed on grid spacing to provide uniform heating of the subsurface
  • Sheets were installed using a Robovib Sidegrip hammer fitted to a Komatsu PC300

Major Project Contaminants:

  • VOCs
  • TCE

Significant Project Obstacles:

  • Working inside a structure
  • Proximity to utilities and structures

Location: NYS Southern Tier
Owner: Confidential Client
Engineer: O’Brien & Gere, Inc.
Project total: $300,000