Oil City, PA

Major Project Tasks:    

  • Installation of waterproof steel sheet piling
  • Adherence to owner and oversight agency’s strict safety standards
  • Installation of a permanent 250’x 25’ deep impermeable Waterloo™ barrier wall with specialized grout at joints
  • Prevention of subsurface oil seepage into an adjacent river through installation of 400 LF of turbidity curtain 

Major Project Contaminants:

  • VOCs

Significant Project Obstacles:

  • Conveyance of an active stream channel away from its natural course

Location: Oil City, PA
Owner: Confidential
Engineer: C3 Environmental
Project total: $145,000