Mid-West Repower

General Location: Mid-West

Abscope was contracted to provide civil improvements for the re-power of a wind farm in Mid-West Region. Abscope closely coordinated its work activities with the trucking company responsible for the delivery of all windmill components

 

Abscopes Responsibilities:

  • Restored 104 Crane Pads
  • Excavated 14,200 linear feet of drainage ditching
  • Overlaid and compacted 39,700 tons of new material to existing access roads (including geo fabric)
  • Installed 6,000 linear feet of erosion and sediment controls throughout the site
  • Hydroseeded over 11 acres
  • Built two 2 laydown yards (total of 7.5 acres)
  • Improved/widened turning radii at site entrances
  • Graded 126 acres of refurbished access roadways
  • Performed grout repairs at the base of 88 wind turbines